Energy- New Construction
- Energy Efficiency & Sustainability Checklist
-
These forms contain the Energy Efficiency & Sustainability Checklist and Worksheets. The Architect/Engineer are to fill out these forms for all new construction projects.
"Projects shall comply with current Ashrae 90.1/ Ashrae 62/IECC"
"Waterless urinals shall be considered in all new projects"
"The equipments/products shall be certified as 'energy star' or as recommended by federal energy management program unless shown not to be cost-effective on a life cycle cost basis"
8 Years Payback Rule: SFB currently pays for High Performance T8 lamps under 8 years payback Rule. In addition to it, the districts are encouraged to present a design proposal with T5 lamps, or higher efficiency A/C units or Heat pumps. The qualification is contingent on utility cost, operating hours, and cost of upgrade.
Rules and Statutes in relation to Energy and Water Efficiency
- ARS 34-451 (A): The department of commerce in consultation with persons responsible for building systems shall adopt and publish energy conservation standards for construction of all new capital projects as defined in section 41-790, including buildings designed and constructed by school districts, community college districts and universities. These standards shall be consistent with the recommended energy conservation standards of the American society of heating, refrigerating and air conditioning engineers and the international energy conservation code.
- ARS 34-451 (E): All state agencies shall procure energy efficient products that are certified by the United States department of energy or the United States environmental protection agency as energy star or that are certified under the federal management program in all categories that are available unless the products are shown not to be cost-effective on a life cycle cost basis.
- ARS 45-313.01: Every effort shall be made to install water free urinals in all new state buildings constructed after the effective date of this section that constitute capital projects as defined in section 41-790 and to install water free urinals in existing state buildings.
- R7-6-261. Energy Saving Measures: New school facility construction and, as required, building renovations in existing schools, shall include, where reasonable, energy conservation upgrades that will provide dollar savings in excess of the cost of the upgrade within eight years of the installation.
FD ID-140 5/9/2007
Energy-Existing Schools
- Energy Grant Closeout Form
-
Project Closeout Form SFB NRG 250-08 for Energy Project Closeout. This form may be filled out online, then print, sign and submit to the SFB including any supporting documentation. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov.
FD ID-246 9/10/2008
- Energy Grant Request for Funds
-
Project Request for Funds Form SFB NRG 300-08 for Energy Grant Projects. This form may be filled out online, then print, sign and submit to the SFB with supporting documentation. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov.
FD ID-253 10/15/2008
- Energy Grant Instructions
-
The Arizona Energy and Water Savings Grant award recipients were approved by the Board on April 3, 2008 (Development Grants)and May 1, 2008 (Implementation Grants). Award letters are being sent to those districts that received grant funding along with the Terms and Conditions as noted in the Instructions below. Please refer to these instructions to proceed with the energy and water savings projects.
FD ID-227 5/7/2008
- Energy Grant Awards
-
Below are the lists of districts that have been awarded either a Development or Implementation Energy Grant.
FD ID-231 6/4/2008
- Energy Calculators
-
Arizona School Facilities Board distributes building renewal funds to the school districts every year. The building renewal funds can be used to upgrade HVAC units, Lighting, Building Envelope/Roofing/ Insulation or Doors and Windows.
You can use the calculators below to determine the Energy savings/Payback with each of these upgrades.
FD ID-139 5/10/2007
LEED
- LEED Executive Order
-
Governor's Executive Order 2005-05 requiring all state funded buildings constructed after 2005 to meet at least the "Silver" Leadership in Energy and Environmental Design standard
FD ID-3 5/10/2007
Excess Utility
- State Utilities Expenditure Analysis
-
The link above is to an excerpt from the SFB FY 2008 Annual Report on Energy-Utility Costs and includes an analysis of utilities expenditures submitted by school districts to the Arizona Department of Education.
FD ID-145 6/4/2007
- Excess Utilities Report by District
-
Click on the alphabetical link below, then select the worksheet tab for the desired district.
FD ID-165 8/28/2007
Resources
- APS Energy Answers for Schools
-
APS Solutions for Business offers this fact sheet to provide an overview of typical energy efficiency strategies and a list of resources for more detailed information.
FD ID-330 6/21/2010
- ENERGY STAR Resources
-
Click the link above for a Quick List of ENERGY STAR Resources for Buildings.
FD ID-328 6/9/2010
- Energy Star Program
-
Join ENERGY STAR and reduce energy consumption... Would you like to get information on ways to reduce energy consumption in your school district? The U.S. EPA is offering several resources through its ENERGY STAR Program. If your school district is interested in being a partner, please sign up for ENERGY STAR by clicking here.
FD ID-212 2/29/2008
General SFB
- SFB Annual Reports
-
As per ARS §15-2002.9, by December 15, the SFB shall submit an annual report to the Governor and the Legislature. Below are the SFB Annual Reports by Fiscal Year.
FD ID-265 12/14/2009
- FY 2011-FY 2015 Five-Year Strategic Plan
-
Five Year Strategic Plan spanning FY 2011 - FY 2015
FD ID-263 2/4/2009
Students First Supreme Court Opinions
- Supreme Court Opinion No. 1: Roosevelt v. Bishop
-
1994 ruling that because the then-present scheme was the source of disparities, it was not in compliance with Arizona Constitution Article XI §1. This Article requires the legislature to enact appropriate laws to finance education in the public schools in a way that does not create substantial disparities among schools, communities or districts.
FD ID-98 7/11/2006
- Supreme Court Opinion No. 2: Hull v. Albrecht
-
1997 ruling that the proposed legislation did not meet the requirements of Article XI because: it is itself the cause of continued substantial disparities among districts; the legislature may not delegate to the districts the responsibility to provide adequate capital facilities; and Article XI mandates adequate capital facilities statewide.
FD ID-99 7/11/2006
- Supreme Court Opinion No. 3: Hull v. Albrecht
-
1998 ruling that the proposed Students FIRST Act of 1998 violates the requirements of the Arizona Constitution to provide a general and uniform public school system due to the provisions establishing the bonding prohibition, compressed assessment ratios and the opt-out option.
FD ID-77 3/6/2006
Rules and Policies
- SFB Rules
-
Complete Rules Document. Last updated December 2006.
FD ID-67 3/6/2006
- Statutes Governing the SFB
-
The statutes that govern the SFB are in Chapter 16 of the Education Code. These begin at ARS 15-2001 through ARS 15-2132
FD ID-116 11/7/2006
- Policy Book Table of Contents
-
FD ID-117 12/13/2006
- Policy Book Section I Board Governance
-
This section discusses the structure of the Board
FD ID-68 3/6/2006
- Policy Book Section II Policy Development
-
This section discusses how the Board's policies are developed
FD ID-69 10/10/2007
- Policy Book Section III Capital Plans
-
This section discusses the factors that are analyzed for capital plan submittal.
FD ID-70 12/8/2009
- Policy Book Section IV Land Acquisition
-
This section discusses the land acquisition process
FD ID-71 11/8/2007
- Policy Book Section V New Construction
-
This section discusses the steps between capital plan approval and construction.
FD ID-72 1/16/2008
- New Construction Moratorium Policy Statement
-
This section discusses the SFB's policy on reimbursement for a new school facility project during the FY 2008 new construction moratorium.
FD ID-252 10/7/2008
- Policy Book Section VI Emergency Projects
-
This section discusses projects that qualify for emergency funding.
FD ID-73 3/7/2008
- Policy Book Section VII Preventive Maintenance
-
This section discusses the Preventive Maintenance Program.
FD ID-74 5/3/2007
- Policy Book Section VIII Building Renewal
-
This section discusses the Building Renewal Program.
FD ID-75 5/2/2008
- Policy Book Section IX Building Renewal Grant Fund
-
This section discusses the eligibility and application process for the Building Renewal Grant fund.
FD ID-251 10/7/2008
- Tribal Government Policy
-
FD ID-233 6/19/2008
Attorney General Opinions
- 2009 Attorney General Opinions
-
The following SFB related Attorney General Opinion was issued in 2009.
FD ID-303 12/10/2009
- 2008 - Attorney General Opinions
-
The following SFB related Attorney General Opinion was issued in 2008.
FD ID-219 4/10/2008
- 2005 - Attorney General Opinions
-
The following SFB related Attorney General Opinions were issued in 2005.,/a>
FD ID-237 6/24/2008
- 2004 - Attorney General Opinions
-
The following SFB related Attorney General Opinions were issued in 2004.
FD ID-87 3/31/2006
- 2003 - Attorney General Opinions
-
The following SFB related Attorney General Opinion was issued in 2003.
FD ID-223 4/11/2008
- 2002 - Attorney General Opinions
-
The following SFB related Attorney General Opinions were issued in 2002.
FD ID-222 4/11/2008
- 2001 - Attorney General Opinions
-
The following SFB related Attorney General Opinion was issued in 2001.
FD ID-221 4/11/2008
- 2000 - Attorney General Opinions
-
The following SFB related Attorney General Opinion was issued in 2000.
FD ID-86 3/31/2006
- 1999 - Attorney General Opinions
-
The following SFB related Attorney General Opinions were issued in 1999.
FD ID-220 4/10/2008
New Construction
- FY 2010 Demographic Report
-
FY 2010 Demographic Report to the Legislature.
FD ID-148 6/15/2010
- Construction Cost Index
-
Construction cost per square foot by grade configuration. Last updated 11/13/08.
FD ID-90 11/13/2008
- Design/Budget Review Meeting Agendas
-
All new school construction projects must include in the design process a Kick-Off Meeting and design and budget review meetings at each of the following stages: Schematic Design, Design Development and Guaranteed Maximum Price/Construction Documents. Below are the agendas for each of these meetings.
FD ID-225 4/21/2008
- Policy on Campus Layouts
-
On November 2, 2006, the School Facilities Board approved the policy regarding campus layouts and allowable exterior lineal feet. This summary shows the number of buildings and amount of exterior lineal feet the SFB will fund. Sample shapes are also included.
FD ID-64 11/2/2006
- Fire Alarm Guidelines
-
Minimum Fire Alarm System Guidelines
FD ID-26 2/15/2006
- Exterior Basketball Court Guidelines
-
Guidelines for the concrete or asphalt hard court
FD ID-27 2/15/2006
- Architectural Fee Guidelines
-
These guidelines are to be used to determine the Lump Sum Architectural & Engineering (A&E) fees for "Basic Services" for all SFB projects, including both New Construction and Deficiency Correction projects.
** These are guidelines, not a schedule **
FD ID-33 2/15/2006
- Funding for Site Specific Conditions
-
Additional funding guide for site specific conditions.
FD ID-29 2/15/2006
- Board of Technical Registration Requirements
-
This item contains a list of requirements needed for the SFB to release funding.
FD ID-30 9/1/2006
- SFB's Non-Participating Role
-
Items the SFB has a non-participating role in. This is a base outline for conversations between SFB and Districts when the opportunity is set to review their latest plans.
FD ID-103 9/1/2006
- Cost Reduction Items
-
Items the SFB does not fund if the construction cost exceeds the approved SFB budget.
FD ID-28 6/23/2006
Schools Under Construction
- Under Construction in FY 2011
-
Check back to see progression photos of schools under construction in FY 2011.
FD ID-235 6/29/2010
General Information
- New Construction Approvals to Date
-
This is a list of all new construction projects awarded by the SFB since 1999. Sorted by district, this excel file may be saved to sort by a different category. Last updated 6/29/2010.
For slower computers, you may wish to download the PDF Version You will not be able to sort in this document.
FD ID-85 6/29/2010
- Conceptually Approved Schools
-
This is a list of schools conceptually approved to date. Conceptual projects are for planning purposes only and have no funding associated with them. Last updated 6/29/2010.
FD ID-121 6/29/2010
- New Construction Photo Gallery
-
This document contains project information, including photos, for every new school construction project funded by the SFB. To view a particular project, open the Bookmark list and click on a district; you may then scroll through the projects. Bookmarks are sorted by district and include only completed projects.
If you would like to submit a photo or provide additional information about your district's project, please email Kerry Campbell at kcampbell@azsfb.gov
FD ID-101 2/5/2009
Building Renewal
- Building Renewal Grant Application
-
Project Application Form SFB BR 900-08 for Building Renewal Grant funding. Please save this form to your local drive, fill it out then print, sign and submit to the SFB including any supporting documentation. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov.
FD ID-248 10/7/2008
- Building Renewal Grant Request for Funds
-
Project Request for Funds Form SFB BR 950-08 for Building Renewal Grant Projects. This form may be filled out online, then print, sign and submit to the SFB with supporting documentation. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov.
FD ID-259 12/10/2008
- Building Renewal Grant Closeout Form
-
Project Closeout Form SFB BR 920-09 for Building Renewal Grant Projects. This form may be filled out online, then print, sign and submit to the SFB with supporting documentation. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov.
FD ID-266 1/20/2009
- FY 2008 Building Renewal Allocation
-
Building Renewal Allocation for FY 2008. Sorted by District, the total allocation is $86,283,500.
FD ID-151 7/20/2007
- FY 2007 Building Renewal Allocation
-
Building Renewal Allocation for FY 2007. Sorted by District, the total allocation is $86,283,500.
FD ID-97 6/21/2006
- FY 2006 Building Renewal Allocation
-
Building Renewal allocation for FY 2006. Sorted by District, the total allocation is $70,000,000.
FD ID-83 3/14/2006
Preventative Maintenance
- Planning Guide for Maintaining Facilities
-
The School Facilities Maintenance Task Force, National Forum on Education Statistics and the Association of School Business Officials International (ASBO) have provided this guide for planning facilities maintenance.
FD ID-254 10/15/2008
- Preventative Maintenance Inspections
-
On September 4, 2008, the Board approved a list of randomly selected districts for inspection of their Preventative Maintenance Program. As each district's PM Inspection Report is approved by the Board, additional randomly selected districts are added to the list.
FD ID-245 1/21/2010
- Directions
-
FD ID-52 2/24/2006
- Life Expectancies Informational Sheet
-
The useful lives of the listed items vary directly with their initial quality and level of maintenance. The list is based upon good quality components and a level of maintenance over the useful life that is consistent with manufacturer specifications.
FD ID-43 2/24/2006
Inspection Reports
- Preventative Maintenance Inspection Reports
-
ARS §15-2002.A.3 requires the SFB to perform preventative maintenance inspections on 20 school districts every 30 months. At the September 2008 Board meeting, the Board randomly selected 20 school districts for inspection. The Board also adopted a policy that requires staff to report to the Board the status of these inspections each September. Further, the Policy requires that the Board select new districts for inspection if any districts have been completed. The inspection reporting process is as follows:
1. Selection 2. Physical Inspection 3. Written Report 4. District Response 5. Board Review/Approval
Click the link below for a table that shows the districts that have been randomly selected and the current status of the inspection/report.
INSPECTION STATUS REPORT
Below are the completed reports:
Blue Ridge Unified Murphy Elementary Naco Elementary San Simon Unified Santa Cruz Valley Union Tombstone Unified
FD ID-297 4/8/2010
21st Century Schools
- 21st Century Schools Report
-
In response to Governor Janet Napolitano's Executive Order 2007-06, the School Facilities Board has published the 21st Century Schools Report - Ensuring Innovative School Facilities for the Digital Age.
FD ID-175 10/2/2007
- Exhibit D-Feedback and Comments
-
These comments were received during the public review period of the 21st Century Schools Report - Ensuring Innovative School Facilities for the Digital Age. This link is referenced in the report. Included are survey results from the Department of Education and the Arizona Technology in Education Association.
FD ID-176 10/2/2007
- Live Interview on Safety Recommendations - 8/8/07
-
SFB Executive Director John Arnold is interviewed by 12 News about the ten new safety recommendations. The link will take you to the article "How safe is your child's school?". To play the video, click on "Play Video" to the far right of the article. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov
FD ID-162 8/20/2007
- Live Interview on 21st Century Schools - 7/5/07
-
SFB Executive Director John Arnold is interviewed by 12 News regarding Building 21st Century Schools.
FD ID-163 8/20/2007
- Executive Order - Building 21st Century Schools
-
Governor's Executive Order 2007-06 Building 21st Century Schools
FD ID-143 5/22/2007
Land Acquisition General Information
- State Land Acquisition/Lease Process
-
Please follow this process for acquiring a State Land Lease for new school construction.
FD ID-199 1/3/2008
- State Land Acquisition Timeline
-
This spreadsheet shows a timeline of the steps required to acquire a State Land Lease.
FD ID-202 1/18/2008
ARRA General Information
- Governor directs $20M to Energy Projects
-
Governor Brewer announced that the application for the State Energy Program through the American Recovery and Reinvestment Act (ARRA) has been submitted to the U.S. Department of Energy. The largest portion of the funds requested, $20 million, will be directed to the completion of energy efficiency and renewable energy projects for Arizona's public schools. The School K-12 Grant Program and Energy Performance Contracting allocates this federal stimulus funding to the School Facilities Board which will be able to leverage both private capital through energy saving preformance contracts and utility company rebate programs to make energy improvements in schools statewide. The SFB anticipates the grant application process to start sometime in August 2009.
FD ID-293 10/14/2009
- ARRA 2009 Fact Sheet
-
The US Department of Education has published this document to provide states and LEAs with basic information regarding how and when Title I, Part A recovery funds will be awarded. In the coming weeks, the Department will provide more guidance regarding these funds, including how they should be used, the sub mission of waiver requests, and the reporting requirements. It also will provide information about Title I School Improvement grants, for which a $3 billion appropriation will be made available beginning Fall 2009. Additional information and documents will be posted on www.ed.gov.
FD ID-291 10/14/2009
ARRA Energy Efficiency Projects
- ARRA Energy Efficiency Project Request for Funds
-
Request for Funds Form SFB ARRA 100-10 for ARRA Energy Efficiency Grant Projects. This form may be filled out online, then print, sign and submit to the SFB with supporting documentation. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov.
FD ID-336 7/13/2010
- Buy American Categorical Waivers
-
On February 11, 2010, the U.S. Department of Energy issued a Memorandum of Decision granting nationwide categorical waivers under section 1605 of the Recovery Act (the Buy American Provisions) for fluorescent electronic lighting ballasts, LED traffic lights and signals, and CFL's (with a few exceptions described in the waiver). These categorical waivers go into effect immediately. Click the link above to read the Memorandum of Decision for details.
FD ID-314 2/16/2010
- Energy Efficiency Grants
-
SFB AWARDS ENERGY EFFICIENCY GRANTS: On January 20, 2010, the Board approved the award of 29 Energy Efficiency Grant projects to 25 districts totallng $12,132,515. In total, these projects, with an estimated cost of $43,600,825, will save $5,567,738 per year in utility costs. The average payback is approximately eight years. Click here for information on the awards.
Scorecard of awarded projects Projects removed from Scorecard
UPDATE 11/17/09: The grant application deadline of November 6, 2009 has passed and the SFB is no longer accepting applications. Our initial review revealed that 105 applications were received; 44 districts submitted applications totaling $103,810,266 in poject costs.
UPDATE 10/6/09: The SFB is not requiring a district governing board resolution at the time a grant application is submitted.
The SFB is now accepting applications for the funding of energy efficiency projects through the stimulus energy grant program. Below are links to the program statement and supporting documents. Please read these documents carefully and direct questions to your district liaison.
Click the link above to start the application process. Choose the district from the drop-down menu, go to GRANTS in the top menu, then select Stimulus Energy Grant Application in the drop-down menu. Click on START NOW to begin a new application. Applications will only be accepted through this online web-based program. To view a DRAFT application, select the School Facilities Board from the drop-down menu and use password E81A9. District applications are PASSWORD PROTECTED.
Q & A Session Presentation Q & A Session Presentation Transcript Commonly Asked Questions UPDATED 10/19/09
STIMULUS ENERGY GRANT PROGRAM STATEMENT PROJECT INFORMATION TEMPLATE LIST OF ESCOs ON STATE CONTRACT SAMPLE ESCO EVALUATION CRITERIA
FD ID-295 1/21/2010
ARRA Solar Projects
- ARRA Solar Energy Grant Project Request for Funds
-
Request for Funds Form SFB ARRA 100-10 for ARRA Solar Energy Grant Projects. This form may be filled out online, then print, sign and submit to the SFB with supporting documentation. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov.
FD ID-333 7/13/2010
- Solar Energy Project Information
-
Please click the link above for information on the solar energy project process.
Below are the solar project awards approved by the Board: Solar Energy Grant Awards Part 1 - Approved 10/8/09 Solar Energy Grant Awards Part 2 - Approved 11/4/09 Solar Grant Adjustment for Patagonia Elementary - Approved 1/20/10
FD ID-294 1/22/2010
Board Happenings
- SFB Board Tours Vista Grande HS Site
-
Prior to the Board meeting on June 5, 2008, members of the SFB Board and staff toured the new Vista Grande High School construction site.
FD ID-236 6/24/2008
- Tour of Valley Vista High
-
Following the November 2, 2006 Board Meeting, the Dysart Unified District provided a tour of their newest high school, Valley Vista High.
FD ID-114 11/7/2006
- October 3, 2006 Conference Photos
-
On October 3, 2006, the SFB and AASBO hosted an all day conference at the Pointe Hilton Squaw Peak in Phoenix. "Overcoming the Challenges of Facilities Planning" had over 300 attendees. The conference consisted of two breakout sessions and three general sessions. Exhibitors were also on hand to show their products and services.
FD ID-110 10/16/2006
- Tour of Desert Oasis Elementary
-
Following the June 1, 2006 Board Meeting, the Tolleson Elementary District provided a tour of their newest school, Desert Oasis Elementary.
FD ID-96 6/12/2006
General Information
- APS Energy Efficiency Opportunities
-
The APS Solutions for Business program provides incentives, training and information services to help school districts increase the energy efficiency of their new and existing facilities. The program encourages school districts to invest in more efficient equipment and systems by reducing the initial project cost and by off-setting the expense of energy studies.
FD ID-331 6/21/2010
- APS Business Solutions Program
-
APS has announced their Business Solutions Program, which can help commercial businesses, K-12 schools, public agencies and industrial customers save money on energy costs. (Please Note: These programs are only available to APS customers.)
FD ID-93 5/9/2006
- SRP PowerWise Business Solutions
-
SRP is offering rebates for installing high-efficiency lighting, heating, ventilation, and air conditioning (HVAC) equipment, motors, and/or variable frequency drives (VFDs). (Please Note: These programs are only available to SRP customers.)
FD ID-179 11/28/2007
- SRP Cool Roof Rebate Program
-
Did your district do any roof re-coating projects this summer? Click the link above for information on SRP's PowerWise Cool Roof Business Solutions Rebate Program. It could be worth 5 cents per square foot to you. Please contact the SRP program administrator at (602) 236-5883 if you have questions. (Please Note: These programs are only available to SRP customers.)
FD ID-250 10/7/2008
- TEP Commerical Energy Solutions Program
-
Tucson Electric Power (TEP) has recently announced a rebate program for energy efficient projects for their commerical customers. The Commerical Energy Solutions Program is for energy improvements in existing commercial (school) buildings. (Please Note: These programs are only available to TEP customers.)
FD ID-249 10/7/2008
- Unisource Energy Services Rebate Program
-
Unisource Energy Services has a business rebate program for energy efficiency projects for their commercial customers. The program is for energy improvements in existing commercial or school buildings. These programs are only available to Unisource Energy Services customers. Visit their website by clicking the link above.
FD ID-337 7/29/2010
New Construction
- Affidavits for Project Manager and Governing Board
-
As required by ARS§15-2041(K)the following affidavits must be signed by the Project Manager and the District Governing Board, respectively, prior to design of a new school project.
FD ID-228 5/22/2008
- Cost Estimate Cover Sheet Instructions
-
Instructions for the Cost Estimate Cover Sheet, used to summarize the cost estimate for a construction project.
FD ID-21 11/19/2007
- Cost Estimate Cover Sheet
-
Form SFB NC 522-06 is used to calculate the additional costs associated with new school construction projects including the A/E fee, pre-construction services, FF&E, Computers, etc.
FD ID-209 2/21/2008
- New Construction Schedule of Values
-
This cost breakdown spreadsheet is filled out by the CM@Risk and used as part of the GMP proposal/negotiation process.
FD ID-107 1/3/2008
- CM@Risk Certification
-
Owner, Architect, and CM@Risk Design Team certify all aspects of project will comply with building adequacy SFB Rules Document
FD ID-23 9/1/2006
- Request for Funds
-
Request funds for new construction process
FD ID-31 5/9/2006
- District and Architect Certification
-
Use this document to certify to the SFB that a particular architect will be performing design services for your district for a given project.
FD ID-25 9/1/2006
- Design Team Concept Certification
-
New School Construction Design Build Project with Owner, Architect & Manufacturer/Builder-Design Team Concept Certification
FD ID-24 9/1/2006
- Closeout Sheet
-
Required documentation for New Construction closeout.
FD ID-32 10/26/2007
- District Funding Resolution
-
Sample resolution for districts to provide if they are contributing district funds to a new construction project
FD ID-82 3/13/2006
- Guideline Waiver Request Form
-
Please submit this form to request a waiver from the minimum guidelines.
FD ID-84 3/23/2006
Emergency Deficiency
- Emergency Application
-
Project Application Form SFB EP 110-08 for Emergency Deficiency Corrections funding. This form may be filled out online, then print, sign and submit to the SFB including any supporting documentation. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov.
FD ID-234 6/23/2008
- Emergency Request for Funds
-
Project Request for Funds Form SFB EP 525-99 for Emergency Deficiency Corrections Projects. This form may be filled out online, then print, sign and submit to the SFB with supporting documentation. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov.
FD ID-242 9/3/2008
- Emergency Project Closeout
-
Project Closeout Form SFB EP 615-08 for Emergency Deficiency Corrections project completion. This form may be filled out online, then print, sign and submit to the SFB. If you have any questions, please contact Kerry Campbell at kcampbell@azsfb.gov.
FD ID-244 9/5/2008
Preventative Maintenance
- PM District Questionnaire
-
Districts may use this questionnaire to conduct a self-evaluation of their preventative maintenance program and the SFB may use it as a tool during the PM inspection process.
FD ID-283 7/10/2009
- PM Plan Approval Statement
-
FD ID-51 2/24/2006
- FY2010 PM Reporting Statement
-
On an annual basis, each district shall submit a Preventative Maintenance Reporting Statement to the SFB , which is signed by the District Maintenance Manager, Superintendent, and Governing Board President.
FD ID-53 7/10/2009
- Electrical Task Sheet
-
The checklists are to be completed by building and filed for each school within the District. The respective SFB Liaison will review these PM files when they inspect the school. Please be sure to view the additional tabs located along the bottom of the page.
FD ID-48 2/24/2006
- HVAC Task Sheet
-
The checklists are to be completed by building and filed for each school within the District. The respective SFB Liaison will review these PM files when they inspect the school. Please be sure to view the additional tabs located along the bottom of the page.
FD ID-41 2/24/2006
- Plumbing Task Sheet
-
The checklists are to be completed by building and filed for each school within the District. The respective SFB Liaison will review these PM files when they inspect the school. Please be sure to view the additional tabs located along the bottom of the page.
FD ID-42 2/24/2006
- Roofing Task Sheet
-
The checklists are to be completed by building and filed for each school within the District. The respective SFB Liaison will review these PM files when they inspect the school. Please be sure to view the additional tabs located along the bottom of the page.
FD ID-44 2/24/2006
- Special Equipment Task Sheet
-
The checklists are to be completed by building and filed for each school within the District. The respective SFB Liaison will review these PM files when they inspect the school. Please be sure to view the additional tabs located along the bottom of the page.
FD ID-45 2/24/2006
- Special Systems Task Sheet
-
The checklists are to be completed by building and filed for each school within the District. The respective SFB Liaison will review these PM files when they inspect the school. Please be sure to view the additional tabs located along the bottom of the page.
FD ID-46 2/24/2006
- Surfaces Task Sheet
-
The checklists are to be completed by building and filed for each school within the District. The respective SFB Liaison will review these PM files when they inspect the school. Please be sure to view the additional tabs located along the bottom of the page.
FD ID-47 2/24/2006
Land Acquisition
- Land Acquisition Applications
-
To apply for review of a potential school site or facility, please complete an application and submit it to Kerry Campbell at kcampbell@azsfb.gov.
FD ID-201 1/17/2008
- Land Acquisition-Terms and Conditions
-
When a district receives funding from the SFB, the district signs Terms and Conditions governing the management of that award. The Board initially adopted T&C's for Purchases on June 14, 1999. On April 3, 2008, the Board modified these and developed a specific set each for Purchases, Leases and Donations.
FD ID-216 4/9/2008
- Affidavit for Pesticide Restrictive Covenants
-
SFB LA 201-08 Affidavit for Pesticide Restrictive Covenants is to be completed during the land acquisition process by the district when there is no agricultural use or farming of land within a one-quarter (1/4) mile radius of the subject property and when no Pesticide Restrictive Covenants are required for any of the parties within a one-quarter (1/4) mile radius of the subject property.
FD ID-224 4/18/2008
21st Century Schools
- School Safety Recommendations
-
Based upon comments received from SFB's Board and the pubic, a literature search, and design references such as CPTED, the SFB recommends that these ten safety features be considered as an element of any school design.
FD ID-153 8/6/2007
- Indoor Air Quality
-
A.R.S. 15-2002.A.14 requires the SFB to provide school districts with information on improving and maintaining the indoor environmental quality in school buildings every two years. The link above provides the information SFB staff has compiled and released to the districts.
FD ID-230 6/4/2008
|