New Construction
- Affidavits for Project Manager and Governing Board
-
As required by ARS§15-2041(K)the following affidavits must be signed by the Project Manager and the District Governing Board, respectively, prior to design of a new school project.
FD ID-228 5/22/2008
- Cost Estimate Cover Sheet Instructions
-
Instructions for the Cost Estimate Cover Sheet, used to summarize the cost estimate for a construction project.
FD ID-21 11/19/2007
- Cost Estimate Cover Sheet
-
Form SFB NC 522-06 is used to calculate the additional costs associated with new school construction projects including the A/E fee, pre-construction services, FF&E, Computers, etc.
FD ID-209 2/21/2008
- New Construction Schedule of Values
-
This cost breakdown spreadsheet is filled out by the CM@Risk and used as part of the GMP proposal/negotiation process.
FD ID-107 1/3/2008
- Request for Funds
-
Request funds for new construction process
FD ID-31 5/9/2006
- District and Architect Certification
-
Use this document to certify to the SFB that a particular architect will be performing design services for your district for a given project.
FD ID-25 9/1/2006
- Design Team Concept Certification
-
New School Construction Design Build Project with Owner, Architect & Manufacturer/Builder-Design Team Concept Certification
FD ID-24 9/1/2006
- CM@Risk Certification
-
Owner, Architect, and CM@Risk Design Team certify all aspects of project will comply with building adequacy SFB Rules Document
FD ID-23 9/1/2006
- Closeout Sheet
-
Required documentation for New Construction closeout.
FD ID-32 10/26/2007
- District Funding Resolution
-
Sample resolution for districts to provide if they are contributing district funds to a new construction project
FD ID-82 3/13/2006
- Guideline Waiver Request Form
-
Please submit this form to request a waiver from the minimum guidelines.
FD ID-84 3/23/2006
|